The Resource Bridge work stopped mid-step

Bridge work stopped mid-step

Label
Bridge work stopped mid-step
Title
Bridge work stopped mid-step
Subject
Summary
All work was halted on the $1.9 million pedestrian bridge over Anzac Parade at Maroubra last Tuesday after the Construction, Forestry, Mining and Energy Union (CFMEU) identified safety risks on the site
http://library.link/vocab/subjectName
  • Industrial safety
  • Bridges
  • Occupational health
  • Pedestrians
  • Maroubra (N.S.W.)
  • Anzac Parade (Maroubra, N.S.W.)
  • Anzac Parade (Maroubra, N.S.W.)
Label
Bridge work stopped mid-step
Instantiates
Publication
Contents
9
Other physical details
IMAGE.
Label
Bridge work stopped mid-step
Publication
Contents
9
Other physical details
IMAGE.

Library Locations

    • Lionel Bowen Library and Community CentreBorrow it
      669-673 Anzac Parade, Marouba, NSW, 2035, AU
      -33.938111 151.237977