The Resource Botany groundwater project : groundwater cleanup plan progress report no. 2 :, Report no. EN1591.61-PR-004 (May 2004), prepared for ICI Australia Engineering Pty. Ltd

Botany groundwater project : groundwater cleanup plan progress report no. 2 :, Report no. EN1591.61-PR-004 (May 2004), prepared for ICI Australia Engineering Pty. Ltd

Label
Botany groundwater project : groundwater cleanup plan progress report no. 2 :, Report no. EN1591.61-PR-004 (May 2004)
Title
Botany groundwater project
Title remainder
groundwater cleanup plan progress report no. 2 :
Title part
Report no. EN1591.61-PR-004 (May 2004)
Statement of responsibility
prepared for ICI Australia Engineering Pty. Ltd
Creator
Contributor
Subject
Language
eng
Dewey number
628.168
http://bibfra.me/vocab/lite/organizationName
Orica Engineering
http://library.link/vocab/relatedWorkOrContributorName
New South Wales
http://library.link/vocab/subjectName
  • Bioremediation
  • Environmental monitoring
  • Pollution
  • Groundwater
Label
Botany groundwater project : groundwater cleanup plan progress report no. 2 :, Report no. EN1591.61-PR-004 (May 2004), prepared for ICI Australia Engineering Pty. Ltd
Instantiates
Publication
Note
  • Revision 0
  • First draft published 10/05/2004
  • Final report published 17/05/2004
Dimensions
30 cm.
Extent
1 v.
Other physical details
plans, tables
Label
Botany groundwater project : groundwater cleanup plan progress report no. 2 :, Report no. EN1591.61-PR-004 (May 2004), prepared for ICI Australia Engineering Pty. Ltd
Publication
Note
  • Revision 0
  • First draft published 10/05/2004
  • Final report published 17/05/2004
Dimensions
30 cm.
Extent
1 v.
Other physical details
plans, tables

Library Locations

    • Lionel Bowen Library and Community CentreBorrow it
      669-673 Anzac Parade, Marouba, NSW, 2035, AU
      -33.938111 151.237977
Processing Feedback ...